亚洲精品在线看 I 亚洲欧美日韩一区二区三区在线观看 I 日韩av第一页 I 婷婷色综合 I 精品av天堂毛片久久久 I 青青草这里只有精品 I 亚洲天堂一区 I 成人三级视频在线观看不卡 I 国产欧美日韩精品a在线看 I 蜜臀av999无码精品国产专区 I 91亚洲精华国产精华液 I 日韩av在线观看免费 I 中文字幕激情视频 I 国产精品国产 I 婷婷视频网 I 色欲天天天综合网 I 亚洲淫片 I 天天看片免费中国一级黄色片 I 欧美日韩综合在线观看 I 性欲av在线 I 免费看一级特黄a大片 I 国产国产成人久久精品 I 色伊人久久 I 久久se精品一区二区 I 国偷自拍第113页 I 人妖欧美一区二区三区 I 国产超碰人人做人人爰 I 国产99精品 I 嫩草视频在线免费观看 I 黄色网在线 I 国产美女搞久久 I 日本打屁股免费网站 I 色小姐在线视频 I 免费黄视频网站 I 伊大人香伊大人香蕉在线视频 t.tui9.xyz

Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.